Character of relocation and of materials encountered; bridge construction; reservoirs.
53 miles of railway relocated in Ohio flood-control project
Ry Age
Railway Age ; 101 , n 10
1936
6 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Artificial tunnel on relocated Milan-Bologna railway in Modena
British Library Conference Proceedings | 2003
|Railway damage and railway reconstruction in the Ohio flood districts
Engineering Index Backfile | 1913
Big Creek Flood Control Project, Cleveland, Ohio Hydraulic Model Investigation
HENRY – Bundesanstalt für Wasserbau (BAW) | 1983
|Interlocking three miles long on Chesapeake and Ohio
Engineering Index Backfile | 1934