New centralized traffic control project includes control of extensive interlocking in Hamilton, Ont, control of power switches and signals at two ends of double track and at four sidings, and control of signals for authorizing train movements by signal indication on all main tracks through Hamilton, and east for 39 mi.
C.T.C. saves train time on Toronto, Hamilton and Buffalo
Ry Signaling Communications
Railway Signaling and Communications ; 46 , n 10
1953
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
C.T.C. saves train time on Pennsylvania
Engineering Index Backfile | 1947
C.T.C. saves train time on Pennsylvania
Engineering Index Backfile | 1947
C.T.C. saves train time on Santa Fe
Engineering Index Backfile | 1947
C.T.C. saves train time on Santa Fe
Engineering Index Backfile | 1947
C.T.C. saves train time on heavy traffic terminal territory
Engineering Index Backfile | 1952