Description of new signaling apparatus on line, which is 31 mi long and is laid to standard 4-ft 8 1/2-in. gage; railroad is electrically worked on 15,000 v 16 2/3 cycles, single phase system, and forms part of direct through route between eastern and central Cantons of Switzerland.
Signalling on swiss south-eastern railway
Ry Gaz
Railway Gazette ; 99 , n 4
1953
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Electrification of Swiss South-Eastern Railway
Engineering Index Backfile | 1940
Automatic signalling on eastern railway of France
Engineering Index Backfile | 1938
A history of North Eastern railway signalling
SLUB | 2016
|Automatic signalling on eastern railway of France
Engineering Index Backfile | 1938
Signalling practice on the Eastern Bengal state railway
Engineering Index Backfile | 1914
|