Track improvements for modernization of 100 yr old line to carry high speed, heavy trains; drainage and track formation; ballast consolidation; continuously welded 300 ft rails; installation of expansion switches.
Modernisation of permanent way in eastern region
Ry Gaz
Railway Gazette ; 114 , n 24 ; p 677-681
1961
5 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1966
Engineering Index Backfile | 1957
Engineering Index Backfile | 1952
Engineering Index Backfile | 1951
Online Contents | 2000