Twin screw grab dredger Ely, was built by Charles Hill and Sons, Albion Dockyard, for British Transport Commission, for service at South Wales Docks, Cardiff; length 214 ft, breadth 44 ft, depth 17 ft; vessel is designed to carry 1800 tons dw on draft of 14 ft 3 in.; propulsion is by 2 Ruston and Hornsby engines, each developing 785 bhp; 12 hinged hopper doors are controlled by 4 hydraulic rams each capable of 90-ton pull; 3 diesel driven grab cranes are fitted.
Bristol-built dredger for South Wales
Shipbldg Shipg Rec
Shipbuilding and Shipping Record ; 97 , n 13
1961
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1940
Scottish-built dredger and hopper barges for South Africa
Engineering Index Backfile | 1966
Leith-built hopper/dredger for Calcutta
Engineering Index Backfile | 1964
S.D. Severn trailing suction dredger for Port of Bristol authority
Engineering Index Backfile | 1966
|The South Wales and Bristol direct railway
Engineering Index Backfile | 1903