Main line is 30 in. from point near Roswell, NM, to Arizona-California border near Needles, Calif; pipe is grade X-56 that has minimum yield strength of 56,000 psi and minimum ultimate strength of 74,000 psi; welding, coating and wrapping, cover, main line valves, and testing of line.
Transwestern ahead of schedule despite adverse weather
Petroleum Engr
Petroleum Engineer ; 32 , n 4
1960
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 2008
Impressive....despite the weather
Kraftfahrwesen | 1978
|Embraer sticks to schedule despite rival's progress
Online Contents | 2013
MTU Friedrichshafen: Growth despite adverse parameters
Online Contents | 2004
WASHINGTON WATCH - Moving ahead despite constraints.
Online Contents | 2012