Details of construction, launching, transportation, and erection of semi-parabolic, Warren-truss, through bridge, 100 m. span weighing 705 tons; bridge was constructed at Kinderdijk was loaded on barges and towed to site at speed of from 2 to 8 3/4 km. per hr.
Transportation of a bridge over the eendracht at Tholen
Het Transport van de brug over de Eendracht bij Tholen
Ingenieur ; 43e , n 41
1928
13 Figs.
Aufsatz (Zeitschrift)
Niederländisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 1994
Online Contents | 1996
GWLB - Gottfried Wilhelm Leibniz Bibliothek | 1844
|Behoud zoetwatervoorziening in West-Brabant en Tholen bij een zout Volkerak-Zoommeer
British Library Online Contents | 2011
|