Describes how retail dealers in Cleveland, O., operating two coal yards, called in efficiency expert; substituted one central yard and equipped it with modern electrically operated machinery; cost of handling, from railroad cars to delivery trucks, reduced to 5 cents per ton; investment of $10,000 put plant on 1000-ton-per-day basis.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    The yard that efficiency dictated


    Weitere Titelangaben:

    Black Diamond


    Erschienen in:

    Black Diamond ; 81 , n 13


    Erscheinungsdatum :

    1928


    Format / Umfang :

    2 pages


    Anmerkungen:

    3 Figs.


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :




    MRAM Design Limiations Dictated by Thermally Activiated Reversal

    Zhu, J. / Jet Propulsion Laboratory | British Library Conference Proceedings | 2002


    Design of highway Guard-rail dictated by tests

    Slack, S.B. | Engineering Index Backfile | 1932


    System classification plan improves yard efficiency

    Fertig, H.R. | Engineering Index Backfile | 1927