Adopted scheme provides for: (1) diversion of river to westward; (2) construction of breakwaters for purpose of eliminating "range" within harbor; and (3) construction of wharves, slipway, railway and other facilities.
Gisborne harbour works, New Zealand
Engineer
Engineer ; 145 , n 3762
1928
2 pages
5 Figs. partly on p. 184
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1930
|Engineering Index Backfile | 1935
Redesign of Port Gisborne for the 21st Century
British Library Conference Proceedings | 1997
|Redesign of Port Gisborne for the 21st Century
British Library Conference Proceedings | 1997
|Engineering Index Backfile | 1935