Background and outline of Surveyor program which involves lander and orbiter configurations; launch vehicle will be Atlas-Centaur; Surveyor lander will be different from all earlier spacecraft, it needs fully self-contained landing system and will be controlled from JPL's Space Flight Operations Facility (SFOF); operation and tracking of Surveyor; details of command and data handling for DSIF (deep-space instrumentation facility) stations involved at Goldstone, Calif, Woomera, Australia, and Johannesburg, South Africa; outline of 5 command modes.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Surveyor -- First lunar laboratory


    Weitere Titelangaben:

    Space/Aeronautics


    Beteiligte:
    Stambler, I. (Autor:in)

    Erschienen in:

    Erscheinungsdatum :

    1963


    Format / Umfang :

    8 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Surveyor 7 lunar mission

    Jaffe, L. D. / Steinbacher, R. H. | NTRS | 1969


    Surveyor 6 lunar mission.

    Jaffe, L. D. | NTRS | 1968




    Lunar surface Surveyor radar response.

    Brown, W. E., Jr. | NTRS | 1967