Works site and distribution of plant at Scunthorpe in relation to material supplies and external communications; inward, outward, and internal railway traffic analyzed; layout of 100 mi of internal railway illustrated; works rolling stock described, with analysis of circulation and performance; terminal time for inward and outward traffic is about 1.5 days; methods of unloading surplus material; systems used for recording and organization of internal traffic. (See also - discussion v 174 pt 4 Aug 1953 p 341-4; see also abstract in Iron and Steel v 26 n 6 May 14 1953 p 223-8 (discussion) 283-6)
Railway traffic of Appleby-Frodingham steelworks
Iron Steel Inst -- J
Iron and Steel Institute -- Journal ; 173 , Part 1
1953
15 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Railway traffic of Appleby-Frodingham steelworks
Engineering Index Backfile | 1953
|Locomotives of Appleby-Frodingham Steel Co., Ltd
Engineering Index Backfile | 1939
|Steelworks shunting locomotives
Engineering Index Backfile | 1955
Shunter for British Steelworks
Engineering Index Backfile | 1951