Requirements were: provision for loading of 150,000 cords of wood every shipping season, protection against open sea, economical operation, etc; selection of site; littoral drift and navigational studies; wharf and loading facilities; work necessitated removal of 430,000 cu yd of material by dredging.
Development of pulpwood shipping harbour, Forestville, Quebec
Eng J
Engineering Journal ; 36 , n 10
1953
8 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Ayr harbour coal shipping plant
Engineering Index Backfile | 1933
|Coal shipping equipment at Muroran Harbour
Engineering Index Backfile | 1937
|Koehring Harvester for Pulpwood
SAE Technical Papers | 1969
|Notable pulpwood carrier enters service
Engineering Index Backfile | 1953
Pulpwood transportation in lake states
Engineering Index Backfile | 1944
|