Crossett, Ark converted its dirt streets to soil cement pavement, then added curbs and gutters; 53,000 lin ft of curb and gutter installed at cost of $1.375 per lin ft; production ranged between 1700 and 1800 lin ft per day; illustrated description of procedure.
City adds low-cost curb, gutter
Eng News-Rec
Engineering News-Record ; 150 , n 16
1953
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.