By rebuilding, tractive effort is raised from 21,620 to 23,500 lb. for freight engines, and from 16,900 to 20,240 lb. for tank engines.
Rebuilt locomotives, London and south western railway
Ry. Gaz
Railway Gazette ; 36 , n 1
1922
3 pages
6 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Rebuilt locomotives, London and South Western railway
Engineering Index Backfile | 1921
Rebuilt express locomotives -- London, Brighton and south coast railway
Engineering Index Backfile | 1922
Rebuilt "Royal scot" locomotives; L.M.S. railway
Engineering Index Backfile | 1943
Rebuilt "Royal scot" locomotives; L.M.S. railway
Engineering Index Backfile | 1943
Engineering Index Backfile | 1919