Dock development at Port of Liverpool to provide facilities for larger ships and container services is described; fixed-bed hydraulic model was designed to reproduce correct tidal levels and currents in vicinity of new dock by controlling input into or flow out of central section of model by pumping water in at each end at constant rate and spilling surplus over weirs at ends, which were continually raised and lowered as necessary to give right levels and right flow from end to end; sea walls will be constructed in slit trenches employing bentonite displacement technique.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Liverpool's seaforth project


    Weitere Titelangaben:

    Dock Harbor Authority


    Beteiligte:

    Erschienen in:

    Erscheinungsdatum :

    1968


    Format / Umfang :

    5 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :



    Liverpool's new tramcars

    Engineering Index Backfile | 1933


    MS. "Seaforth" for African Service

    Engineering Index Backfile | 1939


    Seaforth World Naval Review 2024

    Lambert, Andrew | Taylor & Francis Verlag | 2025


    Seaforth World Naval Review 2016

    Schnappauf, Matt | Online Contents | 2016