Features of design and construction of Port of Eilat, Israel; meteorological conditions showed lack of southerly winds into port, resulting in omission of breakwaters; bearing piles were used for wharves, with fendering system consisting of 14 in. diam tubular rubber units which were hung along main wharf apron.
Eilat -- Israel's eastern gateway
Dock Harbor Authority
Dock and Harbour Authority ; 58 , n 561
1967
5 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 1999
Aqaba-Eilat Airport Feasibility Study
NTIS | 1996
Eilat power, desalting plant meets goals
Engineering Index Backfile | 1967
|VFR nach Israel: Eilat spukt in den Gehirnen
Online Contents | 1999