First stages of extensive road-test program for first turbine-powered train built to North American's newest rail passenger concept are outlined; seven of new trains are in various stages of completion; trainset length, type of accommodations, and installed power can be varied to fit various service requirements; design concepts are described; each Turbo Train is made up of two basic units -- 74-ft power dome cars at both ends and varying number of 57-ft intermediate cars between; each power dome has four engine compartments beneath its elevated floor at lead end.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Turbo train appraisal moving to road test phase


    Weitere Titelangaben:

    Ry Locomotives Cars


    Erschienen in:

    Erscheinungsdatum :

    1967


    Format / Umfang :

    3 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Turbo-train

    Braceland, H.V. | Engineering Index Backfile | 1967


    Road test: Porsche 911 Turbo

    Porsche,Stuttgart,DE | Kraftfahrwesen | 2000


    Road test: Porsche Panamera Turbo

    Porsche,Stuttgart,DE | Kraftfahrwesen | 2009


    Road test: Porsche Cayenne Turbo

    Porsche,Stuttgart,DE | Kraftfahrwesen | 2007


    Road test: Porsche Panamera Turbo

    Kott,D. / Porsche,Stuttgart,DE | Kraftfahrwesen | 2009