Bituminous paving tests were carried out to ascertain operational problems, capacity and limitations of Blaw Knox PF .90 "M" type paver; 3702 tons of tarmacadam base of normal compacted thickness 3 1/4 in, were laid by machine in two days, plus 1112 tons by another machine on same site; averaage overall rate of paving was about 230 tph; effect of different engine speeds and gears on output and on stoppages to forward movement of paver, and of performance of different types of trucks on output is examined.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Intensive bituminous paving trial on warwick by-pass


    Weitere Titelangaben:

    Great Britain. Ministry Transport -- Road Research Laboratory -- Report


    Beteiligte:
    Booth, K. (Autor:in) / Wingate, P.J.F. (Autor:in)


    Erscheinungsdatum :

    1967


    Format / Umfang :

    21 pages


    Medientyp :

    Report


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Intensive bituminous paving trial on the Warwick By-pass

    Booth, K. / Wingate, P. J. F. | TIBKAT | 1967


    Bituminous paving practice

    Engineering Index Backfile | 1949