One bay is devoted to daily cleaning, washing and inspection of every bus operating from garage; filling station is fitted with overhead charging pipes and can fill two buses a minute.
Berlin erects a 200-bus garage
Elec. Ry. Jl
Electric Railway Journal ; 70 , n 10
1927
4 pages
11 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Michigan Erects First SPUI Bridge
British Library Online Contents | 2007
Canadian national erects new catenary
Engineering Index Backfile | 1925
|Launcher erects post-tensioned girders
Engineering Index Backfile | 1967
|Computer `Erects' its own VOR, DME
Engineering Index Backfile | 1952
|F.E.C. erects first all-welded bascule span
Engineering Index Backfile | 1936
|