Works, which were first planned in 1912, replaced facilities located at three different points, thus centralizing locomotive-repair arrangements and thereby effecting considerable economies; Gorton Works are most modern in Argentina. (See also - no. 564 Jan. 1927, pp. 7-15)
The locomotive works of the Central Argentine railway at Perez
Ry. Engr
Railway Engineer ; 48 , n 565
1927
29 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Locomotive for Central argentine railway
Engineering Index Backfile | 1929
Diesel shunting locomotive, Central Argentine railway
Engineering Index Backfile | 1931
Diesel shunting locomotive, Central Argentine railway
Engineering Index Backfile | 1931
Diesel shunting locomotive, Central Argentine railway
Engineering Index Backfile | 1931
Passenger locomotive for the Central Argentine Railway
Engineering Index Backfile | 1911