Electrification committee decided in favor of single-phase current, to be taken from 3-phase trunk lines and converted at substations placed 60 mi. or more apart along line; details of Lilla Edet hydroelectric plant of about 40,000 hp.; 4 water-power plants are connected with steam power station at Vasteras, containing 4 turbines of about 60,000 hp. capacity, 2 of Stal and 2 DeLaval make, 3 generators being built by Asea.
Electrification of the railway Stockholm-Gothenburg
Swedish Export
Swedish Export ; 11 , n 2
1927
5 pages
8 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
The Stockholm-Gothenburg electrification
Engineering Index Backfile | 1930
Stockholm-Roslagen railway electrification
Engineering Index Backfile | 1942
The Stockholm-Goteborg Electrification
Engineering Index Backfile | 1927
Centralizing the railway service in Gothenburg
Engineering Index Backfile | 1930
|Stockholm-Goteborg electrification recently completed
Engineering Index Backfile | 1926
|