Installation on 2998 miles includes latest type of equipment; saving made by unique automatic interlockings. (See also Ry. Age, vol. 82, no. 2, Jan. 8, 1927, pp. 183-186, 9 figs.)
Great northern concludes extensive signaling program
Ry. Signaling
Railway Signaling ; 20 , n 1
1927
5 pages
20 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Great northern concludes extensive signaling program
Engineering Index Backfile | 1927
D. and H. concludes 4-car program
Engineering Index Backfile | 1942
Online Contents | 1994
Signal section concludes busy convention
Engineering Index Backfile | 1928
Telematics / India 2013 Concludes in Pune
Springer Verlag | 2013