Distances between signals and lengths of overlaps are as short as possible, consistent with safety, in order that close headway between trains may be maintained and such traffic kept moving. (See also Ry. Gaz., vol. 47, no. 4, July 22, 1927, pp. 110-111 and 105, 2 figs.)
The re-signalling of edgware road station, metropolitan railway
Ry. Engr
Railway Engineer ; 48 , n 570
1927
6 pages
9 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
The re-signalling of edgware road station, metropolitan railway
Engineering Index Backfile | 1927
Hendon-Edgware extension. London Electric Railway.
Engineering Index Backfile | 1924
Re-signalling of Uxbridge branch, Metropolitan railway
Engineering Index Backfile | 1931
Re-signalling of Uxbridge branch, Metropolitan railway
Engineering Index Backfile | 1931
The signalling of the Wembley widening, Metropolitan Railway
Engineering Index Backfile | 1915