Outlines method of Continental Motors Corp., Detroit, for predetermination of labor costs; labor cost is budgeted after careful analysis in which tools, equipment, comparison with other models, and itemized time elements are considered in sequence in which they are to be performed; analysis of different time elements; summary of advantages of method described and results obtained. (See also - discussion in no. 5, Nov. 1927, pp. 548-550)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Time-study in its relation to labor budget


    Weitere Titelangaben:

    Soc. Automotive Engrs. -- Jl


    Beteiligte:


    Erscheinungsdatum :

    1927


    Format / Umfang :

    2 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    The moisture budget in relation to convection

    Scott, Robert W. / Scoggins, James R. | TIBKAT | 1977


    Budget 2004 . Budget 2004

    Online Contents | 2003


    THEORETICAL CONSEQUENCES OF TRAVEL TIME BUDGET

    TOROK, Adam | TIBKAT | 2014

    Freier Zugriff

    Forecast your budget with real-time software

    Pierce, R. | British Library Online Contents | 2004


    Keeping transit on time, on budget and safe

    British Library Online Contents | 2000