Outlines method of Continental Motors Corp., Detroit, for predetermination of labor costs; labor cost is budgeted after careful analysis in which tools, equipment, comparison with other models, and itemized time elements are considered in sequence in which they are to be performed; analysis of different time elements; summary of advantages of method described and results obtained. (See also - discussion in no. 5, Nov. 1927, pp. 548-550)
Time-study in its relation to labor budget
Soc. Automotive Engrs. -- Jl
Society of Automotive Engineers -- Journal ; 21 , n 4
1927
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
The moisture budget in relation to convection
TIBKAT | 1977
|Online Contents | 2003
Forecast your budget with real-time software
British Library Online Contents | 2004
|Keeping transit on time, on budget and safe
British Library Online Contents | 2000