Due to corrosion of unprotected steel trough flooring and inadequacy to carry traffic over line of Caledonian Railway, bridge built in 1889, was reconstructed without dislocation of train services; reconstruction work consisted of removing old steelwork, taking down old wall or abutment for length of 380 ft and rebuilding it in concrete with sandstone facing, and providing new steel and concrete superstructure to carry regraded roadway.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Reconstruction of Nithsdale road bridge, Glasgow


    Weitere Titelangaben:

    Ry Gaz


    Erschienen in:

    Railway Gazette ; 94 , n 10


    Erscheinungsdatum :

    1951


    Format / Umfang :

    2 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    New Glasgow-Edinburgh road

    Engineering Index Backfile | 1934


    The reconstruction of the Glasgow underground railway

    Burdon, I.P. / Middleton, A.G. | Tema Archiv | 1982


    Glasgow

    Devine | Online Contents | 1996



    Glasgow subway

    Engineering Index Backfile | 1933