Calculation, based on minimum cost of operation for cars and trucks, emphasizes high return of construction cost; data on traffic and traffic control; design standards for pavements and structures; Gulf Freeway, carries 70,200 vehicles per day; its construction costs were $11,000,000 in 4 yr.
Houston urban expressways promise savings of $2,750,000 annually
Civ Eng (NY)
Civil Engineering ; 21 , n 3 ; p 21-23
1951
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1955
Operation of urban expressways
Engineering Index Backfile | 1957
|Planning our urban expressways
Engineering Index Backfile | 1958
|Traffic Management for Urban Expressways
British Library Conference Proceedings | 1994
|Engineering Index Backfile | 1948