Information on Blohm and Voss AG Pioneer design and proposal for building from mass-produced, standardized sections; owner would have choice of ship size, types of cargo handling gear, whether vessel would be dry cargo carrier, with containers or even barges; completion would be in 4 mo from time of order; hull is designed as polyhedron, i.e., constructed from flat plate; charts show dimensional variants and cargo stowage, and arrangements are discussed.
Germans introduce shipbuilding approach
Mar Eng/Log
Marine Engineering/Log ; 72 , n 10 ; p 65-69
1967
5 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
SHIPBUILDING - Shipbuilding Politics - European shipbuilding politics
Online Contents | 1998
|SHIPBUILDING - Shipbuilding Politics - European shipbuilding politics
Online Contents
|Kraftfahrwesen | 1978
Online Contents | 1998
Germans drawn to transfer presses
Kraftfahrwesen | 1995
|