Seaboard Air Line has installed centralized traffic control between Richmond, Va, and Cochran, including 63.5 mi of single track, 1 mi of double track and 6 mi of second track to replace time table and train order operation; power assignments and traffic; methods of switch operation; semi-automatic centralized traffic control signals; coded track circuits; track occupancy indication; etc. (See also Ry Signaling v 35 n 6 June 1942 p 309-17)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    C.T.C. solves track capacity problem on seaboard


    Weitere Titelangaben:

    Ry Age


    Erschienen in:

    Railway Age ; 112 , n 25


    Erscheinungsdatum :

    1942


    Format / Umfang :

    4 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch




    C.T.C. solves track capacity problem on seaboard

    Engineering Index Backfile | 1942