Seaboard Air Line has installed centralized traffic control between Richmond, Va, and Cochran, including 63.5 mi of single track, 1 mi of double track and 6 mi of second track to replace time table and train order operation; power assignments and traffic; methods of switch operation; semi-automatic centralized traffic control signals; coded track circuits; track occupancy indication; etc. (See also Ry Signaling v 35 n 6 June 1942 p 309-17)
C.T.C. solves track capacity problem on seaboard
Ry Age
Railway Age ; 112 , n 25
1942
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
C.T.C. solves track capacity problem on seaboard
Engineering Index Backfile | 1942
C.T.C. solves operating problem on busy single-track line
Engineering Index Backfile | 1948
C.T.C. solves war traffic problem on Texas and Pacific
Engineering Index Backfile | 1942
C.T.C. solves War traffic problem on Texas and Pacific
Engineering Index Backfile | 1942
C.T.C. solves operating problems on Pere Marquette
Engineering Index Backfile | 1945