Accomplishments in highway construction in 1956 reviewed: freeway units totaling over 20 mi in length were completed and made available for public traffic; construction by contract has been started on 11 large freeway sections that have total length of 41 mi; California Highway Commission has adopted four vital freeway routings in separated locations in district.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    District 7 freeways report


    Weitere Titelangaben:

    Calif Highways Pub Works


    Beteiligte:
    Telford, E.T. (Autor:in)

    Erschienen in:

    Erscheinungsdatum :

    1957


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    District VII freeways

    Harding, P.O. | Engineering Index Backfile | 1955


    Freeways in district IV

    Booker, B.W. | Engineering Index Backfile | 1957


    District IV freeways make great strides

    Booker, B.W. | Engineering Index Backfile | 1955


    Freeways

    Elefteriadou, Lily | Springer Verlag | 2013


    Freeways

    Halprin, Lawrence | TIBKAT | 1966