Centralized traffic control and modern signal system installed on 15. 5 mi of single track between Northern Maine Junction, and South La Grange, Me, on Bangor and Aroostook; track circuits are Trakode system; reduced cost of maintaining one single track compared with two previous main tracks is estimated at saving of about $ 2320 per mi annually, totaling $36,000 each yr.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    BAR takes up second track [midline ellipsis] and installs CTC


    Weitere Titelangaben:

    Ry Signaling Communications


    Erschienen in:

    Erscheinungsdatum :

    1957


    Format / Umfang :

    3 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch