Changes in organization and operation of rip (light repair) tracks on Frisco at Springfield, Mo, which have expedited yard inspection, reduced switching delays and car time on rip tracks, and made 24 hr operations feasible; two small rip tracks, located at either end of train yard, each have capacity of 16 cars.
They changed rip track operations
Ry Age
Railway Age ; 142 , n 22
1957
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Piston Ring Designs - Have They Changed?
SAE Technical Papers | 1965
|German guidelines for cycle facilities and how they should be changed
British Library Conference Proceedings | 1990
|39 - BALTIC STATES - Type of cargo and operations changed at major yards
Online Contents | 1998