Swamps on right-of-way of 156-mi road necessitated removal of over 4,000,000 cu yd of peat, muck and marl and backfilling with 5,000,000 cu yd of granular borrow for special fill; work has been done largely with draglines assisted by dump wagons, dump trucks, scrapers and dozers; jetting was used in three locations to help expediate work and provide additional consolidation of granular fill. (see also World Construction v 10 n 3 Mar 1957 p 43-4, 46, 48, 50, 55)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Swamp filling methods on Indiana toll road


    Weitere Titelangaben:

    Roads Streets


    Beteiligte:
    Persons, H.C. (Autor:in)

    Erschienen in:

    Erscheinungsdatum :

    1957


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Toll factors for Indiana turnpike

    Rhodes, Jr., F. | Engineering Index Backfile | 1960


    Toll Road Analysis

    Muller, Robert H. | Wiley | 2012


    Reconstruction of northern Indiana road

    Engineering Index Backfile | 1914


    Tests of road materials of Indiana

    Engineering Index Backfile | 1921


    Brazilian Toll Road Programme

    Yates, C. / International Bridge, Tunnel and Turnpike Association | British Library Conference Proceedings | 1995