Advent of B-52 heavy bomber with 8 jet engines operating in unison under full power has created new requirements for deflecting aircraft blast at both military and civil airports; Air Force tests show that single and multiple curved vane louvered fences meet requirements and perform most satisfactorily; these fences may be procured for $30 to $35 per linear foot installed on existing paving.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Meeting USAF blast fence requirements


    Weitere Titelangaben:

    ASCE -- Proc (J Air Transport Div)


    Beteiligte:
    Tucker, T.A. (Autor:in)


    Erscheinungsdatum :

    1959


    Format / Umfang :

    25 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    USAF mobility requirements

    BROWN, D. | AIAA | 1983


    MODERNIZATION REQUIREMENTS OF THE USAF

    GERRITT, MAJOR GENERAL T. P. | SAE Technical Papers | 1955


    USAF Air Vehicle Operator Training Requirements Study

    E. M. Hall / W. C. Tirre | NTIS | 1998


    Changes in USAF Structural Loads Requirements

    D. Sheets / R. Gerami | NTIS | 1988


    Effect of Aircraft Failures on USAF Structural Requirements

    Lincoln, J.W. / International Council of the Aeronautical Sciences | British Library Conference Proceedings | 2000