24 in., 420 mi line from Hassi Messaoud to Mediterranean port of Bougie designed to transport 80,000 bbl per day; 24 in., 450 mi, 100, 000 bbl per day line is under consideration for completion by Oct 1960, between fields of Edjeleh, Tinguentourine, and Zarzaitine and Mediterranean coast.
Saharan pipeline completed
World Petroleum
World Petroleum ; 30 , n 11
1959
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
NTRS | 1968
NTIS | 1968
British Library Online Contents | 1999
Luckenbach reconversion completed
Engineering Index Backfile | 1949
Online Contents | 2009