Comparative analysis of various bus systems, and of advantages gained against costs incurred; double bus, double breaker system; breaker-and-half scheme; main, reserve and transfer bus; double bus, single breaker and single bus, single breaker systems; ring bus scheme.
Bus scheme is key factor in substation cost
Elec Light Power
Electric Light and Power ; 40 , n 15
1962
5 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
A load factor for substation operators
Engineering Index Backfile | 1930
|SUBSTATION MONITORING SYSTEM, METHOD FOR MONITORING SUBSTATION, AND SUBSTATION MONITORING PROGRAM
Europäisches Patentamt | 2022
|Integrated Automation Scheme of a Distribution Substation for Local-Remote Monitoring and Control
British Library Conference Proceedings | 1993
|