Particulars regarding two-speed continuous induction system, superimposed on existing d.c. signaling, on 102 miles of double track, Sydney, Neb., to Cheyenne, Wyo.; second division is now under construction. Instructions and rules issued to enginemen as to functions and operation of train control.
Union Pacific completes train control
Ry. Signaling
Railway Signaling ; 18 , n 7
1925
7 pages
17 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Union pacific installs train control
Engineering Index Backfile | 1925
Train control on the Union Pacific
Engineering Index Backfile | 1926
Union pacific uses train control successfully on 225-miles
Engineering Index Backfile | 1926
Union Pacific plans high-speed streamlined train
Engineering Index Backfile | 1933
Union Pacific motor coaches supplement train service
Engineering Index Backfile | 1928