Superior Council of Railways has formulated preliminary scheme, providing that State shall undertake construction of railways, and that any public body or private concern shall have right to ask for preference in regard to building of any particular line, subject to public advantage; information tabulated includes lists of existing and projected lines, divided into three groups; total of existing lines dealt with is 9142 km. See brief abstracted translation in Engineer, vol. 139, no. 3617, Apr. 24, 1925, p. 469.
The classification of Spanish railways
Anteproyecto de plan general de ferrocarriles
Revista de Obras Publicas ; 73 , n 7
1925
4 pages
Aufsatz (Zeitschrift)
Spanisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Electrification of Spanish Railways
Engineering Index Backfile | 1919
|Electrification of Spanish State Railways
Engineering Index Backfile | 1946
Locomotives for Spanish national railways
Engineering Index Backfile | 1954
Garratt locomotives for spanish railways
Engineering Index Backfile | 1931
Modernisation of Spanish National Railways
Engineering Index Backfile | 1953