Superior Council of Railways has formulated preliminary scheme, providing that State shall undertake construction of railways, and that any public body or private concern shall have right to ask for preference in regard to building of any particular line, subject to public advantage; information tabulated includes lists of existing and projected lines, divided into three groups; total of existing lines dealt with is 9142 km. See brief abstracted translation in Engineer, vol. 139, no. 3617, Apr. 24, 1925, p. 469.
The classification of Spanish railways
Anteproyecto de plan general de ferrocarriles
Revista de Obras Publicas ; 73 , n 7
1925
4 pages
Aufsatz (Zeitschrift)
Spanisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Electrification of Spanish Railways
Engineering Index Backfile | 1919
|Modernisation of Spanish National Railways
Engineering Index Backfile | 1953
First aid for Spanish railways
Engineering Index Backfile | 1951
|Locomotives for Spanish national railways
Engineering Index Backfile | 1954
Storm damage on Spanish railways
Engineering Index Backfile | 1950