Rail pre-welded in lengths up to 3180 ft. was installed by Birmingham Elec. Co. without interruption to service; joints were thermit welded under pressure produced by special clamps; concrete mixed at a central plant was transported and poured from an end-dumping rail car.
Track reconstruction cost reduced by use of modern equipment