Objectives of Tripartite agreement between Federal Republic of Germany, United Kingdom, and United States were development of BS53 Pegasus 5 engine and P-1127 airframe, and investigation of concepts applicable to P-1127 V/STOL aircraft; certain aspects of Kestrel (P-1127) Tripartite V/STOL Operational Trials which commenced Jan 1 1962, are described including purpose of trials, brief chronology, description of test aircraft, organization of test unit, scope of trials, and selected results and conclusions of trials.
Operational V/STOL kestrel tripartite evaluation
SAE -- Paper
SAE Meeting ; 1966
1966
8 pages
Aufsatz (Konferenz)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Operational V/STOL? Kestrel Tripartite Evaluation
SAE Technical Papers | 1966
|The Kestrel Evaluation Squadron
British Library Conference Proceedings | 2008
|Emerald Group Publishing | 2002
Engineering Index Backfile | 1965
|Operational Constraints for STOL Aircraft
AIAA | 1971
|