Centralized traffic control installed on 175.6 mi of single track main line between Daggett, Calif, and Las Vegas, Nev; project includes entire operating subdivision which is controlled by one centralized traffic control machine located at one end, and made possible by use of carrier current to cut centralized traffic control line codes into three separate operating sections. (See also Ry Signaling v 36 n 9 Sept 1943 p 472-80, 489)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Union Pacific installs C.T.C. on 175 miles of single track


    Weitere Titelangaben:

    Ry Age


    Erschienen in:

    Railway Age ; 115 , n 10


    Erscheinungsdatum :

    1943


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch