Bow and stern sections of ships are fabricated on site, while other sections of hulls are delivered prefabricated at shipyard in southern Indiana, outfitting tank-landing craft; vessels are assembled on building ways, moved longitudinally on 26 dollies into transfer area, from where they are transferred sidewise to launching ways that slope 1 on 4.75 launching of ships is sidewise, under control at all times, and limited to travel of 10 ft per min all vessels are outfitted after they are water-borne.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Fast shipbuilding at inland yard


    Weitere Titelangaben:

    Eng News-Rec


    Erschienen in:

    Erscheinungsdatum :

    1943


    Format / Umfang :

    6 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    A German shipbuilding yard

    Engineering Index Backfile | 1908



    Shipbuilding 90 miles from yard

    Engineering Index Backfile | 1945



    Yard of the federal shipbuilding company

    Engineering Index Backfile | 1919