Latest developments in shipyard design and maximum use of prefabrication methods are features of Marinship, 6-way yard built under high speed construction program at Sausalito, Calif; brief description of yard.
Fitting-out dock at deck level
Shipbldg Shipg Rec
Shipbuilding and Shipping Record ; 62 , n 2
1943
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Shipyard adopts deck-high outfitting dock
Engineering Index Backfile | 1943
Engineering Index Backfile | 1929
Attachment system for connection to dock or deck post
Europäisches Patentamt | 2018
|ATTACHMENT SYSTEM FOR CONNECTION TO DOCK OR DECK POST
Europäisches Patentamt | 2017
|SPECIAL FEATURES - Deck machinery - Dock-launched fast rescue boat
Online Contents | 2000