Description of methods employed, under traffic, including ingenious system of progressive runoffs, to provide increased overhead clearance. (see also Ry Gaz v 79 n 15 Oct 8 1943 p 360)
D. and H. lowers rock floor 2 ft. in 2240-ft. tunnel
Ry Eng Maintenance
Railway Engineering and Maintenance ; 39 , n 6
1943
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
D. and H. lowers rock floor 2 ft. in 2240-ft. tunnel
Engineering Index Backfile | 1943
DataCite | 1888
AIAA-2006-2240 Model Centric Design Engineering Morphology
British Library Conference Proceedings | 2006
|Lucas Chloride produces a weighty ( 2240 kg ) "discussion" hybrid car
Kraftfahrwesen | 1983
|Exploration of Commercial Optimizers for Non-Traditional Laminate Optimization (AIAA 2018-2240)
British Library Conference Proceedings | 2018
|