Illustrated description of construction of 48-in. water pipe line in Newark, NJ; at one point it passes under three tracks of Erie Railroad; it was decided to drive tunnel under tracks, using pressed steel line plates; prefabricated 5-ft sections of reinforcing steel could be moved as unit into tunnel; welding and other operations described. From paper in competition of James F. Lincoln Arc Welding Foundation.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Prefabricated reinforcing steel for tunnel lining


    Weitere Titelangaben:

    Civ Eng (NY)


    Beteiligte:
    Leedom, L.M. (Autor:in)

    Erschienen in:

    Erscheinungsdatum :

    1943


    Format / Umfang :

    2 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Non-linear stiffness behavior and analysis of tunnel lining with reinforcing bar

    Aruga, Takashi / Arai, Yasushi / Tsuno, Kiwamu | IuD Bahn | 2007



    Non-linear Stiffness Behavior and Analysis of Tunnel Lining with Reinforcing Bars

    Aruga, T. / Arai, Y. / Tsuno, K. | British Library Online Contents | 2007


    Tunnel lining tests

    Matsuda, Y. | British Library Online Contents | 2001


    Lining the Connaught tunnel

    Ry, C.P. | Engineering Index Backfile | 1925