Installation on 117 mi of busy single track between Ste Rosalee, Que, and West Junction as means of increasing track capacity and reducing train time. (See also Ry Signaling and Communications v 44 n 2 Feb 1951 p 98-101)
Canadian national installs centralized traffic control on 117-mile sub-division
Ry Age
Railway Age ; 130 , n 14
1951
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Canadian national installs centralized traffic control on 117-mile sub-division
Engineering Index Backfile | 1951
Canadian pacific installs centralized traffic control
Engineering Index Backfile | 1944
Pennsylvania installs centralized traffic control
Engineering Index Backfile | 1942
National railways of Mexico installs centralized traffic control
Engineering Index Backfile | 1946
|Canadian Pacific installs centralized traffic control to solve operating problem
Engineering Index Backfile | 1930