Louisville and Nashville installed centralized traffic control on 136 mi of single track between Henderson, Ky, and Amqui, Tenn; five sidings removed, 11 converted to house or storage tracks, and only 22 equipped with power switches and signals, thus reducing costs of signal system which includes train operation by signal indication.
C.T.C. handles 22 trains on 145 miles of single track on L. and N.
Ry Signaling Communications
Railway Signaling and Communication ; 44 , n 6 ; p 385-390
1951
6 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
40 trains on single-track C.T.C.
Engineering Index Backfile | 1951
Missouri Pacific installs C.T.C. on 82.66 miles of single track
Engineering Index Backfile | 1950
C.T.C. on 107 miles of single-track on Rio Grande
Engineering Index Backfile | 1943
Missouri Pacific installs C.T.C. on 82.66 miles of single track
Engineering Index Backfile | 1950
Southern Pacific installs C.T.C. on 72 miles of single track
Engineering Index Backfile | 1945