Description of handling methods in yard for crating lumber at Libbey-Owen-Ford Glass Co, Plant No. 2 Shreveport, La, where up to 10,000,000 board ft are moved annually to box shop; layout of storage yard shown; storage on wheels aided by trolley ducts and positioning platforms.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    All-track lumber yard


    Weitere Titelangaben:

    Flow


    Erschienen in:

    Flow ; 5 , n 8


    Erscheinungsdatum :

    1950


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :



    Twelve-track yard indicator on the rock island

    Haney, F.E. | Engineering Index Backfile | 1931


    Theoretical study on track grades in marshalling yard

    Innami, T. / Harada, M. | Engineering Index Backfile | 1965


    Out-of-track welding saves in big yard

    Wise, C. | Engineering Index Backfile | 1931