Swamp filling practice on Green's Corner bog in Maine; 10 tons of dynamite estimated to be required to accelerate settlement; 1 1/2 in. diam pipe is used through which dynamite is placed under fill; pipes driven 8 to 12-ft apart.
Blowing the muck
Roads Streets
Roads and Streets ; 93 , n 3
1950
2 pages
Illustrations
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.