Complete electrification works for suburban lines, which extend from Buenos Aires to foot of Andes, include power station of 25,000-kw. capacity, 72.5 mi. of high-tension cables, four traction substations with 15,000 kw. of converting plant, and electrical equipment of 70 mi. of single track. See also Elec. Times, vol. 63, no. 1648, May 17, 1923, pp. 499-503, 7 figs., and Ry. Age, vol. 38, no. 20, May 18, 1923, pp. 756-762 and 764, 16 figs. (10 Figs. partly on p. 526)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Railway electrification in South America


    Weitere Titelangaben:

    Engineer


    Erschienen in:

    Engineer ; 135 , n 3516


    Erscheinungsdatum :

    1923


    Format / Umfang :

    4 pages


    Anmerkungen:

    10 Figs.


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch




    Railway electrification in South America

    Engineering Index Backfile | 1923


    South african railway electrification

    Engineering Index Backfile | 1930


    South african railway electrification

    Engineering Index Backfile | 1927


    Railway electrification in South Africa

    More, J.R. | Engineering Index Backfile | 1933


    Railway electrification in South Africa

    Hoy, Wm. W. | Engineering Index Backfile | 1925