Morgan Engineering Co. adapts buildings to railway contract work with but few changes; details of erecting shop, boiler shop and fittings department, and shop organization.
Ordnance plant makes locomotive repairs
Ry. Mech. Engr
Railway Mechanical Engineer ; 97 , n 9
1923
4 pages
6 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1911
|Engineering Index Backfile | 1929
|Engineering Index Backfile | 1929
|Engineering Index Backfile | 1929
|Engineering Index Backfile | 1910